Forty megawatts of clean power, packed into a single 40-ft module.
Factory-made parts lock into one container — no site to pour, no decade to wait.
Thorium bred to U-233 in fluoride salt — walk-away safe, near-atmospheric.
It leaves the line on a truck and arrives wherever the power is needed.
40 MWe of firm, carbon-free power for the AI load the grid can't reach.
Pick up, deliver, repeat — clean baseload for a community of 40,000.
Heat and power behind the meter, anywhere a container can be driven.
Industry is priced out while load grows faster than any grid plan anticipated. The gap is structural — and it is an opening.
Molten-salt reactors run hot, near atmospheric pressure, and shut themselves down on physics alone. We package the core into a standard container so it can be manufactured on a line, not poured on a site.
Fertile fuel, dissolved into molten fluoride salt.
Bred in the core — the fissile fuel that sustains the reaction.
~700 °C salt drives the primary heat-transfer loop.
Clean, dispatchable electricity onto the European grid.
An independent European thorium company — not a licensee. We own the design, the supply chain, and the deployment.
Each 40 MWe module leaves a factory inside a container and is commissioned on-site in weeks, not years.
Twenty-year power-purchase agreements at €0.04 / kWh. Industry buys electrons — never a reactor on its balance sheet.
Thirteen EU member states now class nuclear as essential to their climate targets. Prices are crushing industry, gas dependence is a strategic liability — and there is still no European thorium company. We are building it.
Manufacturing economics on the build, recurring PPA revenue on the sell — into the widest structural energy gap in Europe.
Reactors built on a production line inside a container — a factory cost curve, not megaproject overruns.
Twenty-year PPAs at €0.04/kWh. Recurring, contracted electricity revenue — the customer never carries a reactor.
We own the design, supply chain and deployment — the only European thorium company, into a market with no incumbent.
Thirteen EU states now class nuclear as essential. The licensing door is open for the first time in a generation.
Vantar is pre-licensing and independently held. We are not publishing investor names or round figures at this stage — qualified investors can request the data room directly.
[ Request the data room ↗ ]For investors, industrial offtakers, and engineers who want to put thorium on the European grid.