VANTAR ENERGY · EUROPE'S THORIUM COMPANY

A reactor
you can ship

[ SCROLL TO ASSEMBLE ]
[ 01 / MODULE ]

A reactor in a container

Forty megawatts of clean power, packed into a single 40-ft module.

[ 02 / ASSEMBLY ]

Built, not constructed

Factory-made parts lock into one container — no site to pour, no decade to wait.

[ 03 / CORE ]

A molten-salt heart

Thorium bred to U-233 in fluoride salt — walk-away safe, near-atmospheric.

[ 04 / DELIVERY ]

Sealed and driven to site

It leaves the line on a truck and arrives wherever the power is needed.

[ 05 / DATA CENTRES ]

Set down at the data centre

40 MWe of firm, carbon-free power for the AI load the grid can't reach.

[ 06 / COMMUNITIES ]

Then on to the next town

Pick up, deliver, repeat — clean baseload for a community of 40,000.

[ 07 / INDUSTRY ]

And the factory beyond the grid

Heat and power behind the meter, anywhere a container can be driven.

The Opportunity
SHEET 01 / 06

Europe runs short of power exactly as demand explodes.

Industry is priced out while load grows faster than any grid plan anticipated. The gap is structural — and it is an opening.

FIG 01
219%
EU power-demand growth by 2050
IEA WEO 2024
FIG 02
€0.22
German industrial price / kWh
vs €0.075 in the US
FIG 03
945 TWh
Data-centre demand by 2030
doubling every 2–3 yrs
The Technology
SHEET 02 / 06
Molten saltTRL 8–9Walk-away safe

Thorium molten-salt — the cleanest dense energy we know how to build.

Molten-salt reactors run hot, near atmospheric pressure, and shut themselves down on physics alone. We package the core into a standard container so it can be manufactured on a line, not poured on a site.

3.5M t
coal-equivalent energy in one ton of thorium
166×
less mining than uranium for the same power
Reactor moduleSPEC / 001
Fuel cycle
Th-232 → U-233
Coolant
Molten fluoride salt
Operating pressure
Near atmospheric
Module output
40 MWe electric
Form factor
40-ft container
Long-lived waste
3.1% of an LWR
Fuel mining
166× less than uranium
Operating carbon
Zero
The Fuel Cycle
01 /

Thorium-232

Fertile fuel, dissolved into molten fluoride salt.

02 /

Uranium-233

Bred in the core — the fissile fuel that sustains the reaction.

03 /

Fission heat

~700 °C salt drives the primary heat-transfer loop.

04 /

40 MWe

Clean, dispatchable electricity onto the European grid.

The Approach
SHEET 03 / 06

Independent. Modular. Built to ship.

A /

We build it ourselves

An independent European thorium company — not a licensee. We own the design, the supply chain, and the deployment.

B /

Manufactured, not constructed

Each 40 MWe module leaves a factory inside a container and is commissioned on-site in weeks, not years.

C /

Sold as power

Twenty-year power-purchase agreements at €0.04 / kWh. Industry buys electrons — never a reactor on its balance sheet.

Why now
SHEET 04 / 06

The regulatory door is opening for the first time in a generation.

Thirteen EU member states now class nuclear as essential to their climate targets. Prices are crushing industry, gas dependence is a strategic liability — and there is still no European thorium company. We are building it.

For Investors
SHEET 05 / 06

A factory-built reactor, sold as contracted power.

Manufacturing economics on the build, recurring PPA revenue on the sell — into the widest structural energy gap in Europe.

Investment thesis[ CAPITAL / 001 ]
40 MWe
per container module
factory-built, line-manufactured
€0.04
target PPA price / kWh
vs €0.22 German industrial
20 yr
power-purchase agreements
recurring, contracted revenue
Pre-license
current stage
building toward first module
[ 01 ]

Manufactured, not constructed

Reactors built on a production line inside a container — a factory cost curve, not megaproject overruns.

[ 02 ]

Sold as power, not plant

Twenty-year PPAs at €0.04/kWh. Recurring, contracted electricity revenue — the customer never carries a reactor.

[ 03 ]

Independent & European

We own the design, supply chain and deployment — the only European thorium company, into a market with no incumbent.

[ 04 ]

Regulatory tailwind

Thirteen EU states now class nuclear as essential. The licensing door is open for the first time in a generation.

Stage

Vantar is pre-licensing and independently held. We are not publishing investor names or round figures at this stage — qualified investors can request the data room directly.

[ Request the data room ↗ ]
Get in touch
SHEET 06 / 06

Build the energy company
Europe doesn't have yet.

For investors, industrial offtakers, and engineers who want to put thorium on the European grid.

Malte Wagenbach — Founder & CEO